Construction scheduling, cost optimization, and management / H. Adeli, A. Karim.

By: AdeliContributor(s): Karim, Asim SalimulMaterial type: TextTextPublisher: New York Spon Press 2001Description: xvi, 319p. ill. 25cmISBN: 041524417X Subject(s): Construction industry -- Management | Production schedulingDDC classification: 624.068 ADE 2001
Tags from this library: No tags from this library for this title. Log in to add tags.
    Average rating: 0.0 (0 votes)
Item type Current location Call number Materials specified Status Date due Barcode
Book-GN Book-GN Perpustakaan Ibnu Khaldun
General Collection
624.068 ADE 2001 (Browse shelf) Available 0000040345

Includes bibliographical references and index

There are no comments on this title.

to post a comment.

Powered by Koha